Skip to main content

Integration

How Microsoft Project and Oracle Primavera P6 exchange data

1 data object syncs

Unverified. Vendor confirmation arrives with the vendor portal.

0 of 1 vendor-confirmed

Partner

Oracle Primavera P6 (manual)

Microsoft Project and Oracle Primavera P6 exchange schedules via XML (MSPDI / P6 XML). MS Project schedules export to XML for import into P6, and P6 schedules export to XML/XER for import into MS Project, giving a two-way schedule interchange between the two CPM tools.

Syncs both ways

  • Schedules Unverified · AECi